- Location
- Oxford
- Sector
- Industrial / Commercial
- System
- Promat VERMICULUX®-S
- Rating
- 120 minutes

As part of the refurbishment of an existing 600 m² building in Oxford, the structural steelwork needed 120 minutes of fire resistance: the beams and posts, the raking braces and cross-bracing in the brick walls, and the steel around the lift shafts and staircases. The photos below show members before and after encasement.
The Challenge
Every member had to reach the same 120-minute rating, but each steel section heats up at a different rate, so the protection had to be sized member by member. Much of the steel was hollow sections and flat bracing with no flanges to fix to, the work ran at height across a live refurbishment, and it had to keep pace with the main contractor's programme.
Our Approach
We surveyed every member and recorded it in Bolster against the structural gridlines, with its section, length and the board build-up it needed. We then encased the steel in Promat VERMICULUX®-S, an A1 non-combustible calcium silicate board that is impact resistant, chemically inert and covered by an Environmental Product Declaration. We had invested in training a large share of our operatives in Promat's systems, so the work could be completed in full compliance with the relevant EN standards and the site's own quality requirements. A ten-strong team fitted 20, 30 and 35 mm boards to Promat's details, with Promat providing design detailing and support on site:
- UB 254 × 146 beams: two layers of 30 mm board
- CHS 88.9 raking braces, RHS 140 posts and 10 × 100 mm flat cross-bracing: two layers of 20 mm board
- Boards cut to size, aligned and screw-fixed to steel angles at 200 mm centres, with the angles fixed back to the wall where there is no flange
- Joints and edges sealed, with inspections at each stage and before and after photos on every pin
The Result
950 m² of board was installed in 12 weeks, on programme and to a high technical standard. The client received the installation details, programme records, site photographs, quality inspection certificates and product data sheets at handover. The project was featured in International Fire & Safety Journal News, Brickwork Bulletin and across the building trade press online.
The contract was supervised by our founder, Krasimir Mitev, who said it had “significantly increased our capabilities and I am confident it will help us secure an even greater variety of work in the future.”








In the press
Featured in 8 publications
Online
- Brickwork BulletinNewsletterXFacebookInstagram
- Building Innovations NewsX
- ATB NewsX
- XtraBuildX
- Specifier SelectX
- White Wall Business MediaXLinkedIn
- L2 Architectural MediaLinkedIn
Written by Ward Turner Publicity. Our thanks to them for telling the story and placing it in the trade press.